Skip to content

Design. Approve. Build.Granny Flat Solutions Across Sydney

ALL SYDNEYGRANNY FLATSDesign. Approve. Build.

Granny flat FAQs

Plain answers to the questions Sydney homeowners ask most. Planning information is general — eligibility depends on your zoning, lot, site constraints and approval pathway.

Planning, design and cost

Can I build a granny flat on my Sydney property?

Often, yes. In NSW a granny flat is called a secondary dwelling, and it is permitted in residential zones R1 to R5 (and in some other zones where the local council's plan allows it).

Whether your property qualifies, and which approval pathway applies, depends on your zoning, lot size and width, easements, slope, trees, heritage, flood and bushfire mapping, and access. A site assessment is the quickest way to find out.

How much does a granny flat cost?

It depends on the design, size, finish level and — often most of all — your site: access, slope, excavation, drainage and service connections. Approval fees are another variable.

Our price guide and cost estimator give a starting point for each type of granny flat, with allowances for approvals, site works and common extras. Tell us about your property and we'll prepare a written, itemised quote after assessing the site.

Do granny flats require council approval?

Yes, a granny flat needs approval. There are two main pathways: a Complying Development Certificate (CDC), which can be issued by council or a registered private certifier if the proposal meets the set standards; or a development application (DA) lodged with your local council.

What is a Complying Development Certificate?

A CDC is a combined planning and construction approval for straightforward proposals that meet pre-set standards. For granny flats, those standards are in Schedule 1 of the State Environmental Planning Policy (Housing) 2021.

One requirement is a lot of at least 450 m². If your land is smaller, a new granny flat can't be approved as complying development unless it sits entirely within an existing house — but a development application may still be possible.

How long does it take to build a granny flat?

Timing depends on design, the approval pathway, site conditions, weather and selections. A CDC is generally quicker than a DA. We'll give you a project timeline specific to your property once the site has been assessed.

What is the maximum granny flat size in NSW?

In residential zones, granny flats are typically limited to 60 m² of floor area. For complying development, the floor-area calculation also considers the principal dwelling and attached structures such as carports, garages, decks and verandahs.

Rural zones can be different — some councils' local environmental plans set their own maximum floor area for secondary dwellings.

Can I build a two-bedroom granny flat?

Yes. Two-bedroom layouts are popular and can be designed within the floor-area limit, usually with an open living and kitchen area, one or two bathrooms and a laundry.

Can I rent out my granny flat?

Yes, a granny flat can be rented out. It stays on the same lot as the main house — a lot with a secondary dwelling can't be subdivided, so the granny flat can't be sold separately.

Rental demand and returns vary by location and aren't guaranteed. Speak with your accountant about tax, and check insurance and tenancy obligations.

Do you offer custom designs?

Yes. You can start from one of our layouts and adjust it, or we can design a granny flat around your site, household needs and budget.

What does a free site assessment include?

We review your property's size, access, slope, existing structures and services, and discuss what you'd like to build. We'll then outline the likely approval pathway, suitable layouts and the next steps toward a written quote.

More questions

Can a granny flat be attached to my house?

Yes. Under NSW planning rules a secondary dwelling can be located within, attached to, or separate from the main house, as long as it is self-contained.

Can I build a granny flat on a lot smaller than 450 m²?

Not as complying development, unless the granny flat is entirely within an existing house. A development application to your local council may still be possible, and we can help you understand whether it's worth pursuing.

Do I need to provide extra parking?

The Housing SEPP doesn't require additional parking for a secondary dwelling. If the project would remove existing on-site parking, check any existing development consent and your council's requirements.

Can I build a new house and a granny flat at the same time?

Yes. The Housing SEPP allows a new principal dwelling and a secondary dwelling to be approved under a single complying development certificate, where both meet the relevant standards.

Can I have more than one granny flat?

No. A secondary dwelling can only result in one principal dwelling and one secondary dwelling on the lot.

Are the designs on this website ready to build?

The layouts currently shown are demonstration designs that show how our catalogue works. Final plans, floor areas, inclusions and pricing are prepared for your property after the site assessment.

Have a question about your property?

Every site is different. A free site assessment gives you answers specific to your block.

Get a Free Site Assessment
CallGet Free Quote